Scottsville ES
Go back to the Plan Room page.
Project Details
Scopes and pricing due to Chris Puffenbarger by Tuesday, Aug. 29, at 5 p.m. at cpuff@mathers-team.com or fax 540.932.2322.
Addendums
Specs
Drawings
- A-0.1 Code Study
- A-0.2 Accessibility Requirements
- A-1.0 Demo Plans, Elevations, Sections, RCP
- A-1.1 Plan, Elevations & RCP
- A-1.2 Roof Plan, Roof Details & Finish Plan
- A-3.1 Schedules, Interior Elevations, Englarged Plan
- A-3.2 Wall Types, Terminations and Frame Details
- A-4.1 Building and Wall Sections
- A-9.1 Details C0.0 Cover
- C1.0 Notes and Details
- C1.1 Notes and Details
- C2.0 Existing Conditions and Demo Plan
- C3.0 Erosion & Sediment Control Notes & Details
- C3.1 Erosion & Sediment Control Plan Phase 1
- C3.2 Erosion & Sediment Control Plan Phase 2
- C4.0 Layout Plan
- C5.0 Grading & Drainage Plan
- C6.0 Storm Water Management Plan
- E1.1 Floor Plan – Electrical – Demoltion
- E2.1 Floor Plan – Lighting – New Work
- E2.2 Floor Plan – Power – New Work
- E3.1 Schedules & Electrical Riser
- L1.0 Landscape Plan
- M-1.1 Floor Plan – HVAC – Demolition
- M-1.2 Floor Plan – HVAC – New Work
- M-1.3 Schedules, Details, and Controls
- P1.1 Floor Plan – Plumbing – New Work
- P1.2 Schedules, Details and Risers
- S0.1 General Structural Notes
- S1.0 Foundation & Roof Framing Plan
- S2.0 Foundation Details
- S2.1 Foundation Details
- S3.0 Framing Details
- S3.1 Framing Details
- TS Title Sheet